CLOB Setup
Per-book rules, phases, and operator controls
5 books
Book Selector
edit one book at a timeIdentity
read-onlyStatus & Manual Phase Control
operator controlsToday's Phase Schedule
session 2026-05-24 - times in UTC| # | Phase | Start (HH:mm) | End (HH:mm) | Status | Active |
|---|---|---|---|---|---|
| 1 | PreOpen | ||||
| 2 | OpeningAuction | ||||
| 3 | Continuous | ||||
| 4 | ClosingAuction | ||||
| 5 | PostTrade |
Per-Phase Rule Overrides
baseline + overrides combine into effective rules per phase; empty fields mean inherit baseline| Phase | Matching Algo Override | Allowed Order Types | Allowed TIFs | Match | Cancel | New Order | Notes |
|---|---|---|---|---|---|---|---|
| PreOpen | |||||||
| OpeningAuction | |||||||
| Continuous | |||||||
| ClosingAuction | |||||||
| PostTrade | |||||||
| Halted |